Sino Thickener Project

Australia

Arccon has been awarded a contract for the design and construction of two 90 metre tailings thickeners at the Sino Iron project at Cape Preston by China Metallurgical Group Corporation (MCC). Arccon submitted a non-conforming lump-sum bid for these thickeners which provided the client with significant cost and time savings.

Project principal: 
China Metallurgical Group Corporation (MCC)
Commencement date: 
November 2010
Completion date: 
May 2011

News

Contact

Australia